Project Details:As result of the Covid-19 of 2019, the pedettrian trafiic congestion at the ferry crossing channel become more and more serious problem, it is top urgent to build the floating freidge used by pedestrians and the cyclists as the ferry services. Wok on the Sh1.7 billion foot-bridge will be completed only in four months, The new crossing channel links Mombass island to the mainland to the south of Kenya.
Customer name: The Kenya National Hightway Authority
Construciton time: 2020-8
Location: LIWATONI MOMBASA, KENYA
Products: 1000mm x 14mm, S355J0C, length 18 meter to 51 meter, 2800 tons with 500um DFT International epoxy coating.